Burla, : In a historical order passed by Hon’ble OERC on 2nd July2024, videRef No. OERC/Engg. -2/2006/701,in which Hon’ble OERC has waived off the pre installation technical feasibility study by discoms for installation of Roof Top Solarsystem up to 10KW.
In this Order Hon’ble OERC has opened easy path for consumers to apply for Roof Top Solar system and get them installed under various government programs. Before this order was made effective, a team of discomtechnical officials are required to visit the customers premises and submit a technical feasibility study report, which is used to take some time and the entire application processing time was getting delayed.
Now there is no technical feasibility study requirement up to 10KW load, the application processing will be fast forward and consumer can installtheir Roof Top Solar equipment at the earliest and can enjoy the Net Metering Benefit.
+ There are no comments
Add yours